Stourbridge Junction pedestrian bridge was manufactured and transported to site in one piece, weighing a little over 22 tonnes and with a span of 22.2 metres.
Passing over the B4186, the bridge provides a link between Stourbridge Junction Railway Station and the new car park. The Bridge was of deck and beam construction with stainless faced lighting boxes and stainless mesh guarding on the parapets.
|